地下水修复
 擅于迅速给出地下水修复措施
环境影响评估
JBS&G专长于提供给地方、州和国家政府审批的环境、社会和经济影响评估。
审核与合规
我们的审核师涵盖了所有州省的审核系统 (Vic – 53x & 53v Audits, NSW Auditor Scheme, WA DER, SA EPA, NT EPA, Qld DEH...
卫生健康与有害物质
既然做了,就将它做好
尽职调查和责任
快速为您定制务实、经济的专业建议来降低您业务中的风险。
Ecology
Our experienced team specialise in conducting baseline ecological surveys that meet and exceed the r...
受污染土地
JBS&G 是一家业内领先的处理各种受污染土地的专业公司

Projects

JBS&G was engaged to undertake both above ground and below ground asbestos assessments, resulting in a site wide strategy for the safe removal and management of asbestos, as part of the redevelopment of the Villawood Immigration Detention Facility.  The risk-based approach adpoted by JBS&G was overseen by various independent reviewers and followed strict national protocols.  By limiting disturbance and minimising the volumes of waste materials requiring handling and disposal, the redevelopment proceeded in a manner which ensured the safety of all identified potential receptors including bot the workforce and the broader community.

 JBS&G above ground works included pre-demolition hazardous material surveys of the residential unit & surrounding buildings prior to planned demolition and redevelopment. At the time of the surveys, the building units were still occupied which introduced a significant number of constraints due to the sensitivity of the project.   JBS&G were also engaged to conduct clearance inspections and asbestos air monitoring during removal & demolition of the buildings.  This project was completed under strict time frame requirements.

Villawood, NSW